Installation of LEDPIYER®

INSTALLATION OF LEDPIYER®

Before the installation, power and color of intended environment light is determined. Accordingly, 12V electricity wiring as with manual button with dimmer or not or remote control are drawn and power source are fixed on suitable place. After checking the lights, installation of LEDPIYER® can started. First, upper connection hanger kits where LEDPIYER® is mounted by screw to the roof. Main body of LEDPIYER® which prepared formerly cutting according to wall dimensions, is affixed to this kit and installed to the wall with standard screws again. Leds are placed and mounted over aluminum cooler profile which has led channels in the main body and are made functional by wiring 12 V power cables. Finally, front cover part is closed sticking to its socket. Thereby process of LEDPIYER® is finished.

Indırect Ceiling Lighting Installation - Cornice Lighting Systems